In February the Thermofluidics team travelled to Dhaka in Bangladesh to set up the uDAHR on two test sites at working farms with their partner iDE. The uDAHRs were installed in hand-drilled boreholes with depths to water of 7m and 22m and powered by the FuturePump SF2 with PV panels.